6 August: Time-lapse concrete pouring

 

Download this video, or download the latest version of Flash Player to view it inline.

Transcript

About this Video At the end of July 2010, the final digging was completed and the base of the concrete water tank was poured on the World Heritage, World Futures site.
Length: 2 min 38 sec